![]() ![]() After completion of Template support erection, plumbness checking and alignment of erected support structure shall commence.Placed bolts in all holes with washers positioned and nuts threaded to complete assembly.Conduct inspection to template hole for anchor bolt location, anchor bolt elevation prior for installation of anchor bolts.Place outside support post and bracing on first poured concrete footing fixed with level adjusting devices such as expansion bolt.Provide temporary bracing prior for alignment of Anchor bolt template.Position the crane on designated area prior for lifting and erection of anchorage Template.Setting of Structural supports or other adjusting devices shall be in a manner that will ensure structural members are located in correct positions and elevations.All materials shall be place on designated area near the location for assembly and erection.Type I : Post and Beam Type – Hanger type of temporary supports for Equipment Template is recommendable to 4.?meters diameter and below.Design of Equipment Template support base on Equipment foundation type and actual site condition.Prior to turnover, ensure that the completed foundation Re-bars work was already checked and its dimensions, levelness, alignment, top of concrete elevation, and others are as per the latest revision of drawings and within acceptable tolerances.Check foundations and other connection points to confirm locations, orientation elevation and condition.Secure necessary work permit from prior to start of work/activity. Secure valid Work Transfer Sheet form Civil Discipline. Confirm the turnover of civil works foundation/pedestals form for the installation. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |